Boulder Parking Lot Marked Ahead of EV Charging Design

A civil engineering firm needed the lot's underground utilities marked before their survey crew arrived. Quote approved one day, lot marked the next, written record the same week.

5.0 on Google, 7 reviews. Read them

Project, September 2026

A parking lot marked ahead of EV charging design

The job. A civil engineering firm was preparing a survey for an EV charging installation in a commercial parking lot in Boulder. Before their crew could shoot the site, they needed the underground utilities under the parking areas and drive aisles marked, and they needed it quickly.

What we did. We walked the parking areas and driveways first, looking for the structures: vaults, pull boxes, valve cans, light bases. Where a structure gave us access we put the electromagnetic locator on direct connect and traced the run. Then we swept the drive aisles with ground-penetrating radar for anything that would not carry a signal. Everything went down in APWA color code at the approximate horizontal location, with no depth, and the survey crew shot the marks along with the rest of the site.

The record. A written record of what was searched, what was traced and how, and what was marked went to the engineer the same week, so the drawing carries the method as well as the lines.

The timeline. The firm asked for a fast turnaround. The quote went out, was approved and the deposit paid, the lot was marked the following day, and the record followed. The engineer's reply was a thank-you for the speed.

If you are an engineer, surveyor or property owner with a site to mark before design, send the site and the date you need it through the request form, or call or text (719) 800-4937.

A site to mark before design?

Send the site and the date you need it through the request form, or call or text (719) 800-4937. Firm number before we mobilize.