Three Days of Utility Locates on a Telluride School Campus
A school district booked a multi-day, per-diem campus markout: EM and GPR across the whole site, APWA marks, written record of anything not found.
Project, September 2025
Three days on a mountain-town school campus
The job. A school district in Telluride booked three days of underground utility locates across its high school campus in September 2025. Telluride is a long way from the Front Range, so this was a multi-day, per-diem booking: mobilize once, stay, and work the campus end to end.
Why a campus is different. 811 marks the utility companies' lines up to the meters. On a campus that leaves most of what is buried unmarked: the private water and sewer between buildings, the electrical feeds to each building, the communications runs, the irrigation, the site lighting. The drawings for a campus built and added to over decades are rarely complete, and every project the district runs digs through the gaps.
What we did. Electromagnetic locating for everything that carried a signal, ground-penetrating radar for what did not, and paint in APWA color code at the approximate horizontal location, no depth. Whatever could not be located was documented in writing rather than left as a blank on the ground.
Why it is on this page. Districts, colleges and facility owners outside the Front Range sometimes assume a Colorado Springs locator will not travel. We will, for a multi-day job, and the per-diem booking makes the trip make sense for both sides.
If you have a campus or a large site to mark, send the site and the window you need it in through the request form, or call or text (719) 800-4937.
A campus or a large site to mark?
Send the site and the window you need it in through the request form, or call or text (719) 800-4937. Multi-day bookings anywhere in Colorado.